Home / Bitcoin miners / Bitaxe Gamma 602
To be released · last price $89 per unit · Bitaxe · Air-cooled · SHA-256
The Bitaxe Gamma 602 (1.3 TH/s) is a air-cooled SHA-256 bitcoin ASIC miner from Bitaxe released in Mar 2026. It runs at 1.3 TH/s while drawing 15 W, an efficiency of 11.54 J/TH. It is not shipping yet — create an account to be told when units are available.
More on this machine: Bitaxe Gamma 602 profitability history
As of Sep 21, 2026, hosted in Argentina at 6.0¢/kWh with 98.7% uptime. Bitcoin $87,031.
| Period | Bitcoin mined | Revenue | Electricity | Profit |
|---|---|---|---|---|
| Daily | 0.000001 BTC | $0.05 | $0.02 | $0.03 |
| Weekly | 0.000004 BTC | $0.37 | $0.16 | $0.22 |
| Monthly | 0.000019 BTC | $1.63 | $0.68 | $0.95 |
| Yearly | 0.000224 BTC | $19.52 | $8.17 | $11.35 |
Electricity per bitcoin mined: $36,425. Year 1 return: 1%.
| Site | Cooling | Rate | Uptime | Cost per BTC | Profit per month | All-in per unit | Year 1 return |
|---|---|---|---|---|---|---|---|
| UAE | Immersion | 6.0¢ | 99.3% | $36,425 | $1 | $1,649 | 1% |
| Nigeria | Air-cooled | 3.9¢ | 73.6% | $23,676 | $1 | $1,046 | 1% |
| Argentina | Air-cooled | 6.0¢ | 98.7% | $36,425 | $1 | $922 | 1% |
| Specification | Value |
|---|---|
| Manufacturer | Bitaxe |
| Model | Bitaxe Gamma 602 |
| Release date | Mar 2026 |
| Algorithm | SHA-256 |
| Hashrate | 1.3 TH/s |
| Power consumption | 15 W |
| Efficiency | 11.54 J/TH |
| Cooling | Air-cooled |
| Weight | 0.34 kg (approx.) |
The Bitaxe Gamma 602 (1.3 TH/s) is to be released with us; its market price is about $89 per unit ($68.46 per TH/s). Delivered, imported, installed and hosted in Argentina with a two-month hosting deposit, the all-in cost is about $922 per machine.
As of Sep 21, 2026, hosted in Argentina at 6.0¢/kWh, the Bitaxe Gamma 602 (1.3 TH/s) is calculated to generate $0.03 daily, $0.95 monthly and $11.35 yearly after electricity, at a bitcoin price of $87,031. It always changes with bitcoin's price and network difficulty.
Electricity to mine one bitcoin with the Bitaxe Gamma 602 costs about $36,425 in Argentina, and $36,425 in UAE and $23,676 in Nigeria. Bitcoin trades at $87,031, so every coin it mines is made 58% below the price of buying one.
At current bitcoin price and difficulty, the Bitaxe Gamma 602 returns 1% in its first year at our sites, after electricity, against everything paid up front: the machine, shipping, import, infrastructure, setup and hosting deposit. You keep the machine and every bitcoin it mines. It always changes.
The Bitaxe Gamma 602 produces 1.3 TH/s of SHA-256 hashrate and consumes 15 W, giving an efficiency of 11.54 J/TH.
The Bitaxe Gamma 602 measures about n/a and weighs around 0.34 kg.
The Bitaxe Gamma 602 is air-cooled with fans. In the UAE we run air-cooled machines in immersion tanks instead, which keeps them cool in desert heat.
We can host the Bitaxe Gamma 602 in UAE (6.0¢/kWh, 99.3% uptime, immersion), Nigeria (3.9¢/kWh, 73.6% uptime) and Argentina (6.0¢/kWh, 98.7% uptime). The bitcoin it mines goes straight to your own wallet.
Bitaxe announced the Bitaxe Gamma 602 in Mar 2026.