Home / Bitcoin miners / Bitdeer SealMiner A3 Pro Hyd
In stock · $9,762 per unit · Bitdeer · Hydro-cooled · SHA-256
The Bitdeer SealMiner A3 Pro Hyd (666 TH/s) is a hydro-cooled SHA-256 bitcoin ASIC miner from Bitdeer released in Sep 2025. It runs at 666 TH/s while drawing 8,325 W, an efficiency of 12.5 J/TH. It is in stock (ships in 5 days) at $9,762 per unit, delivered and hosted at one of our sites.
More on this machine: Bitdeer SealMiner A3 Pro Hyd price history · Bitdeer SealMiner A3 Pro Hyd profitability history
As of Sep 21, 2026, hosted in Argentina at 6.0¢/kWh with 98.7% uptime. Bitcoin $87,031.
| Period | Bitcoin mined | Revenue | Electricity | Profit |
|---|---|---|---|---|
| Daily | 0.000315 BTC | $27.40 | $12.72 | $14.68 |
| Weekly | 0.002204 BTC | $191.81 | $89.06 | $102.75 |
| Monthly | 0.009577 BTC | $833.54 | $387.01 | $446.52 |
| Yearly | 0.114917 BTC | $10,001.33 | $4,643.61 | $5,357.71 |
Electricity per bitcoin mined: $40,408. Year 1 return: 35%.
From $9,898 in Apr 2026 to $9,898 in Sep 2026 (+0%).
| Month | Price per unit | Price per TH |
|---|---|---|
| Apr 2026 | $9,898 | $14.86 |
| May 2026 | $9,898 | $14.86 |
| Jun 2026 | $9,898 | $14.86 |
| Jul 2026 | $9,898 | $14.86 |
| Aug 2026 | $9,898 | $14.86 |
| Sep 2026 | $9,898 | $14.86 |
| Site | Cooling | Rate | Uptime | Cost per BTC | Profit per month | All-in per unit | Year 1 return |
|---|---|---|---|---|---|---|---|
| UAE | Hydro-cooled | 6.0¢ | 99.3% | $40,408 | $449 | $12,822 | 42% |
| Nigeria | Hydro-cooled | 3.9¢ | 73.6% | $26,266 | $434 | $15,113 | 34% |
| Argentina | Hydro-cooled | 6.0¢ | 98.7% | $40,408 | $447 | $15,263 | 35% |
| Specification | Value |
|---|---|
| Manufacturer | Bitdeer |
| Model | Bitdeer SealMiner A3 Pro Hyd |
| Release date | Sep 2025 |
| Algorithm | SHA-256 |
| Hashrate | 666 TH/s |
| Power consumption | 8325 W |
| Efficiency | 12.5 J/TH |
| Cooling | Hydro-cooled |
The Bitdeer SealMiner A3 Pro Hyd (666 TH/s) costs $9,762 per unit ($14.66 per TH/s). Delivered, imported, installed and hosted in Argentina with a two-month hosting deposit, the all-in cost is about $15,263 per machine.
As of Sep 21, 2026, hosted in Argentina at 6.0¢/kWh, the Bitdeer SealMiner A3 Pro Hyd (666 TH/s) is calculated to generate $14.68 daily, $446.52 monthly and $5,357.71 yearly after electricity, at a bitcoin price of $87,031. It always changes with bitcoin's price and network difficulty.
Electricity to mine one bitcoin with the Bitdeer SealMiner A3 Pro Hyd costs about $40,408 in Argentina, and $40,408 in UAE and $26,266 in Nigeria. Bitcoin trades at $87,031, so every coin it mines is made 54% below the price of buying one.
At current bitcoin price and difficulty, the Bitdeer SealMiner A3 Pro Hyd returns 34–42% in its first year at our sites, after electricity, against everything paid up front: the machine, shipping, import, infrastructure, setup and hosting deposit. You keep the machine and every bitcoin it mines. It always changes.
The Bitdeer SealMiner A3 Pro Hyd produces 666 TH/s of SHA-256 hashrate and consumes 8,325 W, giving an efficiency of 12.5 J/TH. Its hydro cooling loop adds about 200 W for water pumps.
The Bitdeer SealMiner A3 Pro Hyd is hydro-cooled: water carries heat away from the hashboards, so it runs quietly with no fans and needs a cooling loop with a dry cooler.
We can host the Bitdeer SealMiner A3 Pro Hyd in UAE (6.0¢/kWh, 99.3% uptime), Nigeria (3.9¢/kWh, 73.6% uptime) and Argentina (6.0¢/kWh, 98.7% uptime). The bitcoin it mines goes straight to your own wallet.
The Bitdeer SealMiner A3 Pro Hyd sold for $9,898 in Apr 2026 and $9,898 as of Sep 2026, up 0%. Over that time it ranged from $9,762 to $9,967.
Bitdeer announced the Bitdeer SealMiner A3 Pro Hyd in Sep 2025.
Also sold as Bitdeer SealMiner A3 Pro Hyd (660 TH/s).