Home / Bitcoin miners / Bitmain Antminer S19 XP+ Hyd

Bitmain Antminer S19 XP+ Hyd (266 TH/s)

Sold out · Last price $2,566 all-in, delivered, installed and hosted in Argentina · Bitmain · Hydro-cooled · SHA-256

Bitmain Antminer S19 XP+ Hyd bitcoin miner

The Bitmain Antminer S19 XP+ Hyd (266 TH/s) is a hydro-cooled SHA-256 bitcoin ASIC miner from Bitmain released in Oct 2024. It runs at 266 TH/s while drawing 5,054 W, an efficiency of 19 J/TH. It is currently sold out; the figures below show what it would earn if hosted with us today.

More on this machine: Bitmain Antminer S19 XP+ Hyd price history · Bitmain Antminer S19 XP+ Hyd profitability history · Antminer S19 XP+ Hyd review: cheap hashrate, and a halving only cheap power clears

Part of the Bitmain Antminer S19 XP line: Bitmain Antminer S19 XP price, hosting and profitability

Bitmain Antminer S19 XP+ Hyd profitability

As of Nov 1, 2026, hosted in Argentina at 6.5¢/kWh with 98.7% uptime. Bitcoin $77,951.

PeriodBitcoin minedRevenueElectricityProfit
Daily0.000112 BTC$8.75$8.49$0.25
Weekly0.000785 BTC$61.23$59.46$1.77
Monthly0.003413 BTC$266.08$258.39$7.69
Yearly0.040956 BTC$3,192.59$3,100.37$92.21

Electricity per bitcoin mined: $75,699. Year 1 return: 4%.

Bitmain Antminer S19 XP+ Hyd price history

From $2,990 in Oct 2024 to $1,061 in Sep 2026 (-65%).

MonthPrice per unitPrice per TH
Oct 2024$3,163$11.89
Nov 2024$3,562$13.39
Dec 2024$3,439$12.93
Jan 2025$3,538$13.30
Feb 2025$3,091$11.62
Mar 2025$2,939$11.05
Nov 2025$2,259$8.49
Mar 2026$810$3.05
Apr 2026$810$3.05
May 2026$821$3.09
Jun 2026$782$2.94
Jul 2026$880$3.31
Sep 2026$1,061$3.99

Where to host the Bitmain Antminer S19 XP+ Hyd

SiteCoolingRateUptimeCost per BTCProfit per monthAll-in per unitYear 1 return
UAEHydro-cooled6.5¢99.3%$75,699$8$2,4154%
NigeriaHydro-cooled4.5¢73.6%$52,407$65$2,53031%
ArgentinaHydro-cooled6.5¢98.7%$75,699$8$2,5664%

Bitmain Antminer S19 XP+ Hyd specifications

SpecificationValue
ManufacturerBitmain
ModelBitmain Antminer S19 XP+ Hyd
Release dateOct 2024
AlgorithmSHA-256
Hashrate266 TH/s
Power consumption5054 W
Efficiency19 J/TH
CoolingHydro-cooled
Dimensions410 x 170 x 209 mm (approx.)
Weight16.5 kg (approx.)

Bitmain Antminer S19 XP+ Hyd FAQ

How much does the Bitmain Antminer S19 XP+ Hyd cost?

The all-in price of the Bitmain Antminer S19 XP+ Hyd (266 TH/s) is about $2,566 per machine, delivered, imported, installed and hosted in Argentina with a two-month hosting deposit. That is the machine itself at $754 ($2.83 per TH/s, the Hong Kong price) plus shipping, infrastructure, import duty, customs, setup and the deposit. It is sold out; these figures use the price it last sold for in Jun 2026.

Is the Bitmain Antminer S19 XP+ Hyd (266 TH/s) profitable?

As of Nov 1, 2026, hosted in Argentina at 6.5¢/kWh, the Bitmain Antminer S19 XP+ Hyd (266 TH/s) is calculated to generate $0.25 daily, $7.69 monthly and $92.21 yearly after electricity, at a bitcoin price of $77,951. It always changes with bitcoin's price and network difficulty.

What does it cost to mine one bitcoin with the Bitmain Antminer S19 XP+ Hyd?

Electricity to mine one bitcoin with the Bitmain Antminer S19 XP+ Hyd costs about $75,699 in Argentina, and $75,699 in UAE and $52,407 in Nigeria. Bitcoin trades at $77,951, so every coin it mines is made 3% below the price of buying one.

What is the year 1 return of the Bitmain Antminer S19 XP+ Hyd?

At current bitcoin price and difficulty, the Bitmain Antminer S19 XP+ Hyd returns 4–31% in its first year at our sites, after electricity, against everything paid up front: the machine, shipping, import, infrastructure, setup and hosting deposit. You keep the machine and every bitcoin it mines. It always changes.

What is the hashrate and power consumption of the Bitmain Antminer S19 XP+ Hyd?

The Bitmain Antminer S19 XP+ Hyd produces 266 TH/s of SHA-256 hashrate and consumes 5,054 W, giving an efficiency of 19 J/TH. Its hydro cooling loop adds about 200 W for water pumps.

What are the dimensions and weight of the Bitmain Antminer S19 XP+ Hyd?

The Bitmain Antminer S19 XP+ Hyd measures about 410 x 170 x 209 mm and weighs around 16.5 kg.

Is the Bitmain Antminer S19 XP+ Hyd air-cooled or hydro-cooled?

The Bitmain Antminer S19 XP+ Hyd is hydro-cooled: water carries heat away from the hashboards, so it runs quietly with no fans and needs a cooling loop with a dry cooler.

Where can the Bitmain Antminer S19 XP+ Hyd be hosted?

We can host the Bitmain Antminer S19 XP+ Hyd in UAE (6.5¢/kWh, 99.3% uptime), Nigeria (4.5¢/kWh, 73.6% uptime) and Argentina (6.5¢/kWh, 98.7% uptime). The bitcoin it mines goes straight to your own wallet.

How has the price of the Bitmain Antminer S19 XP+ Hyd changed?

The Bitmain Antminer S19 XP+ Hyd sold for $2,990 in Oct 2024 and $1,061 as of Sep 2026, down 65%. Over that time it ranged from $762 to $3,604.

When was the Bitmain Antminer S19 XP+ Hyd released?

Bitmain announced the Bitmain Antminer S19 XP+ Hyd in Oct 2024.

Alternatives to the Bitmain Antminer S19 XP+ Hyd