Home / Bitcoin miners / MicroBT Whatsminer M70
Sold out · Last price $3,962 all-in, delivered, installed and hosted in Argentina · MicroBT · Air-cooled · SHA-256
The MicroBT Whatsminer M70 (228 TH/s) is a air-cooled SHA-256 bitcoin ASIC miner from MicroBT released in Dec 2025. It runs at 228 TH/s while drawing 3,306 W, an efficiency of 14.5 J/TH. It is currently sold out; the figures below show what it would earn if hosted with us today.
More on this machine: MicroBT Whatsminer M70 price history · MicroBT Whatsminer M70 profitability history
As of Nov 1, 2026, hosted in Argentina at 6.5¢/kWh with 98.7% uptime. Bitcoin $77,951.
| Period | Bitcoin mined | Revenue | Electricity | Profit |
|---|---|---|---|---|
| Daily | 0.000096 BTC | $7.50 | $5.34 | $2.15 |
| Weekly | 0.000673 BTC | $52.48 | $37.41 | $15.07 |
| Monthly | 0.002926 BTC | $228.07 | $162.59 | $65.48 |
| Yearly | 0.035105 BTC | $2,736.50 | $1,950.86 | $785.64 |
Electricity per bitcoin mined: $55,572. Year 1 return: 20%.
From $2,849 in Feb 2026 to $2,589 in Aug 2026 (-9%).
| Month | Price per unit | Price per TH |
|---|---|---|
| Feb 2026 | $2,801 | $12.29 |
| Mar 2026 | $2,609 | $11.45 |
| Apr 2026 | $2,615 | $11.47 |
| May 2026 | $2,562 | $11.24 |
| Jun 2026 | $2,490 | $10.92 |
| Jul 2026 | $2,589 | $11.36 |
| Aug 2026 | $2,589 | $11.36 |
| Site | Cooling | Rate | Uptime | Cost per BTC | Profit per month | All-in per unit | Year 1 return |
|---|---|---|---|---|---|---|---|
| UAE | Immersion | 6.5¢ | 99.3% | $55,572 | $66 | $4,169 | 19% |
| Nigeria | Air-cooled | 4.5¢ | 73.6% | $38,473 | $86 | $3,986 | 26% |
| Argentina | Air-cooled | 6.5¢ | 98.7% | $55,572 | $65 | $3,962 | 20% |
| Specification | Value |
|---|---|
| Manufacturer | MicroBT |
| Model | MicroBT Whatsminer M70 |
| Release date | Dec 2025 |
| Algorithm | SHA-256 |
| Hashrate | 228 TH/s |
| Power consumption | 3306 W |
| Efficiency | 14.5 J/TH |
| Cooling | Air-cooled |
| Dimensions | 430 x 155 x 226 mm (approx.) |
| Weight | 13.5 kg (approx.) |
The all-in price of the MicroBT Whatsminer M70 (228 TH/s) is about $3,962 per machine, delivered, imported, installed and hosted in Argentina with a two-month hosting deposit. That is the machine itself at $2,466 ($10.82 per TH/s, the Hong Kong price) plus shipping, infrastructure, import duty, customs, setup and the deposit. It is sold out; these figures use the price it last sold for in Aug 2026.
As of Nov 1, 2026, hosted in Argentina at 6.5¢/kWh, the MicroBT Whatsminer M70 (228 TH/s) is calculated to generate $2.15 daily, $65.48 monthly and $785.64 yearly after electricity, at a bitcoin price of $77,951. It always changes with bitcoin's price and network difficulty.
Electricity to mine one bitcoin with the MicroBT Whatsminer M70 costs about $55,572 in Argentina, and $55,572 in UAE and $38,473 in Nigeria. Bitcoin trades at $77,951, so every coin it mines is made 29% below the price of buying one.
At current bitcoin price and difficulty, the MicroBT Whatsminer M70 returns 19–26% in its first year at our sites, after electricity, against everything paid up front: the machine, shipping, import, infrastructure, setup and hosting deposit. You keep the machine and every bitcoin it mines. It always changes.
The MicroBT Whatsminer M70 produces 228 TH/s of SHA-256 hashrate and consumes 3,306 W, giving an efficiency of 14.5 J/TH.
The MicroBT Whatsminer M70 measures about 430 x 155 x 226 mm and weighs around 13.5 kg.
The MicroBT Whatsminer M70 is air-cooled with fans. In the UAE we run air-cooled machines in immersion tanks instead, which keeps them cool in desert heat.
We can host the MicroBT Whatsminer M70 in UAE (6.5¢/kWh, 99.3% uptime, immersion), Nigeria (4.5¢/kWh, 73.6% uptime) and Argentina (6.5¢/kWh, 98.7% uptime). The bitcoin it mines goes straight to your own wallet.
The MicroBT Whatsminer M70 sold for $2,849 in Feb 2026 and $2,589 as of Aug 2026, down 9%. Over that time it ranged from $2,322 to $2,849.
MicroBT announced the MicroBT Whatsminer M70 in Dec 2025.