Progress report · Oct 1, 2026 · 4 min read
Bought in January 2025 and racked in the UAE, it has paid its power bill every month and covered a third of its hardware. It is also an 18.5 J/TH machine, which makes its next two years the clearest test of the forward figures we publish.
Bitmain Antminer S21 Immersion (227 TH/s)
A 227 TH/s S21 Immersion at 18.5 J/TH, bought at $3,814 and landed at $5,255, racked in the UAE at 6¢ in January 2025. Our Nigeria site runs air and hydro, so an immersion machine's home is the UAE and it has been there for all 678 days.
It has mined and kept 0.0741 BTC, worth about $5,054 today, for $4,275 of electricity: about $57,700 one BTC over its run. That is $779 of cashflow, or 15% of its landed cost, on a machine a little under half way through a four-year life.
At 6¢ it makes a bitcoin for about $61,900 of electricity today. The S21 XP Immersion, which is also immersion-cooled and runs at 13.5 J/TH, does it for about $45,100.
The arithmetic behind that gap is simple. A machine's line is the hashprice at which it stops covering its power, and at 18.5 J/TH a petahash uses 444 kWh a day: $26.64 at 6¢. Network hashprice was $39.77 per petahash per day on 30 September on our hashprice chart, so it clears the line with room: about half as much again.
Room is what it has today; distance is what it lacks for 2028. The gap is more than a third in electricity per BTC, and that is the whole case for the newer machine.
At 18.5 J/TH a petahash burns 444 kWh a day. That is $26.64 at 6¢, against a hashprice of $39.77.
The 2028 halving cuts the BTC a petahash earns in half. At today's price and difficulty that would put hashprice near $19.90, under this machine's $26.64 line at 6¢. It is today's conditions held flat, not a forecast, and it is why our forward figures assume bitcoin returns to its previous high, as every projection on the site does.
On that assumption, with the price back at $124,493, it adds another 0.055 BTC by April 2028, worth about $6,873: roughly 1.5× its landed cost by the halving. The same arithmetic with bitcoin where it is today does not clear the line. That is what separates this machine from a 13.5 J/TH one, and why efficiency decides how many halvings a machine survives.
It is the machine where the assumption matters most. It is also an assumption that has held after every previous halving.
The first price we hold for the 227 TH/s unit, on 7 January 2025, was $16.80 a terahash. It is $6.51 today, $1,478 a unit, for the same machine at the same 18.5 J/TH. A buyer now pays less than half what we did for identical output.
A low entry price does a lot of work for a machine like this: at today's price it returns about 4% in its first year. It does not change the efficiency, which is the part that meets the halving.
Buy it as a short, cheap position in hashrate: you are racking in the UAE, you want immersion because that is the room you have, and you are comfortable with a return that leans on the 2028 recovery.
Look at the S21 XP Immersion instead if you are planning past the halving. At $8.30 a terahash it costs more per terahash, and returns about 23% in year one against this machine's 4%. It makes one BTC for about $45,100, which is where the runway comes from.
Firsthand Bitcoin sells and hosts mining hardware, including this machine. No manufacturer, distributor or affiliate programme paid for or reviewed this page and we take no commission on the links above. Historical figures are computed from daily bitcoin price and network hashprice, each day valued at its own prices. Nothing here is investment advice.