Home / Bitcoin miners / Bitmain Antminer S19 Pro+ Hyd
Sold out · last price $1,530 per unit · Bitmain · Hydro-cooled · SHA-256
The Bitmain Antminer S19 Pro+ Hyd (191 TH/s) is a hydro-cooled SHA-256 bitcoin ASIC miner from Bitmain released in Mar 2022. It runs at 191 TH/s while drawing 5,252 W, an efficiency of 27.5 J/TH. It is currently sold out; the figures below show what it would earn if hosted with us today.
More on this machine: Bitmain Antminer S19 Pro+ Hyd profitability history
As of Sep 21, 2026, hosted in Argentina at 6.0¢/kWh with 98.7% uptime. Bitcoin $87,031.
| Period | Bitcoin mined | Revenue | Electricity | Profit |
|---|---|---|---|---|
| Daily | 0.000090 BTC | $7.86 | $8.14 | -$0.28 |
| Weekly | 0.000632 BTC | $55.01 | $56.95 | -$1.95 |
| Monthly | 0.002747 BTC | $239.05 | $247.51 | -$8.46 |
| Yearly | 0.032957 BTC | $2,868.25 | $2,969.73 | -$101.49 |
Electricity per bitcoin mined: $90,110. Year 1 return: -3%.
| Site | Cooling | Rate | Uptime | Cost per BTC | Profit per month | All-in per unit | Year 1 return |
|---|---|---|---|---|---|---|---|
| UAE | Hydro-cooled | 6.0¢ | 99.3% | $90,110 | -$9 | $3,484 | -3% |
| Nigeria | Hydro-cooled | 3.9¢ | 73.6% | $58,572 | $58 | $3,816 | 18% |
| Argentina | Hydro-cooled | 6.0¢ | 98.7% | $90,110 | -$8 | $3,867 | -3% |
| Specification | Value |
|---|---|
| Manufacturer | Bitmain |
| Model | Bitmain Antminer S19 Pro+ Hyd |
| Release date | Mar 2022 |
| Algorithm | SHA-256 |
| Hashrate | 191 TH/s |
| Power consumption | 5252 W |
| Efficiency | 27.5 J/TH |
| Cooling | Hydro-cooled |
| Dimensions | 410 x 170 x 209 mm (approx.) |
| Weight | 15.2 kg (approx.) |
The Bitmain Antminer S19 Pro+ Hyd (191 TH/s) is sold out with us; its market price is about $1,530 per unit ($8.01 per TH/s). Delivered, imported, installed and hosted in Argentina with a two-month hosting deposit, the all-in cost is about $3,867 per machine.
As of Sep 21, 2026, hosted in Argentina at 6.0¢/kWh, the Bitmain Antminer S19 Pro+ Hyd (191 TH/s) is calculated to lose $0.28 daily, $8.46 monthly and $101.49 yearly after electricity, at a bitcoin price of $87,031. It always changes with bitcoin's price and network difficulty.
Electricity to mine one bitcoin with the Bitmain Antminer S19 Pro+ Hyd costs about $90,110 in Argentina, and $90,110 in UAE and $58,572 in Nigeria. Bitcoin trades at $87,031, so every coin it mines is made above the price of buying one.
At current bitcoin price and difficulty, the Bitmain Antminer S19 Pro+ Hyd returns -3–18% in its first year at our sites, after electricity, against everything paid up front: the machine, shipping, import, infrastructure, setup and hosting deposit. You keep the machine and every bitcoin it mines. It always changes.
The Bitmain Antminer S19 Pro+ Hyd produces 191 TH/s of SHA-256 hashrate and consumes 5,252 W, giving an efficiency of 27.5 J/TH. Its hydro cooling loop adds about 200 W for water pumps.
The Bitmain Antminer S19 Pro+ Hyd measures about 410 x 170 x 209 mm and weighs around 15.2 kg.
The Bitmain Antminer S19 Pro+ Hyd is hydro-cooled: water carries heat away from the hashboards, so it runs quietly with no fans and needs a cooling loop with a dry cooler.
We can host the Bitmain Antminer S19 Pro+ Hyd in UAE (6.0¢/kWh, 99.3% uptime), Nigeria (3.9¢/kWh, 73.6% uptime) and Argentina (6.0¢/kWh, 98.7% uptime). The bitcoin it mines goes straight to your own wallet.
Bitmain announced the Bitmain Antminer S19 Pro+ Hyd in Mar 2022.