Home / Bitcoin miners / Bitmain Antminer S19 Pro+ Hyd
Sold out · Last price $3,514 all-in, delivered, installed and hosted in Nigeria · Bitmain · Hydro-cooled · SHA-256
The Bitmain Antminer S19 Pro+ Hyd (191 TH/s) is a hydro-cooled SHA-256 bitcoin ASIC miner from Bitmain released in Mar 2022. It runs at 191 TH/s while drawing 5,252 W, an efficiency of 27.5 J/TH. It is currently sold out; the figures below show what it would earn if hosted with us today.
More on this machine: Bitmain Antminer S19 Pro+ Hyd price history · Bitmain Antminer S19 Pro+ Hyd profitability history · Bought ten weeks before bitcoin's 2022 low, the Antminer S19 Pro+ Hyd has now run four years
Part of the Bitmain Antminer S19 Pro line: Bitmain Antminer S19 Pro price, hosting and profitability
As of Nov 1, 2026, hosted in Nigeria at 4.5¢/kWh with 73.6% uptime. Bitcoin $77,951.
| Period | Bitcoin mined | Revenue | Electricity | Profit |
|---|---|---|---|---|
| Daily | 0.000060 BTC | $4.68 | $4.55 | $0.13 |
| Weekly | 0.000421 BTC | $32.78 | $31.85 | $0.93 |
| Monthly | 0.001828 BTC | $142.47 | $138.42 | $4.05 |
| Yearly | 0.021930 BTC | $1,709.45 | $1,660.89 | $48.56 |
Electricity per bitcoin mined: $75,737. Year 1 return: 1%.
From $14,413 in Mar 2022 to $611 in Mar 2025 (-96%).
| Month | Price per unit | Price per TH |
|---|---|---|
| Mar 2022 | $14,291 | $74.82 |
| Apr 2022 | $12,426 | $65.06 |
| May 2022 | $8,465 | $44.32 |
| Jun 2022 | $6,733 | $35.25 |
| Jul 2022 | $6,525 | $34.16 |
| Aug 2022 | $5,822 | $30.48 |
| Sep 2022 | $4,521 | $23.67 |
| Oct 2022 | $3,566 | $18.67 |
| Nov 2022 | $2,840 | $14.87 |
| Dec 2022 | $2,693 | $14.10 |
| Jan 2023 | $2,894 | $15.15 |
| Feb 2023 | $2,936 | $15.37 |
| Mar 2023 | $3,136 | $16.42 |
| Apr 2023 | $3,050 | $15.97 |
| May 2023 | $2,850 | $14.92 |
| Jun 2023 | $2,733 | $14.31 |
| Jul 2023 | $2,664 | $13.95 |
| Aug 2023 | $2,489 | $13.03 |
| Sep 2023 | $2,145 | $11.23 |
| Oct 2023 | $2,053 | $10.75 |
| Nov 2023 | $1,900 | $9.95 |
| Dec 2023 | $2,107 | $11.03 |
| Jan 2024 | $2,302 | $12.05 |
| Feb 2024 | $2,139 | $11.20 |
| Mar 2024 | $2,067 | $10.82 |
| Apr 2024 | $1,730 | $9.06 |
| May 2024 | $1,284 | $6.72 |
| Jun 2024 | $1,284 | $6.72 |
| Jul 2024 | $1,282 | $6.71 |
| Aug 2024 | $997 | $5.22 |
| Sep 2024 | $563 | $2.95 |
| Oct 2024 | $607 | $3.18 |
| Nov 2024 | $695 | $3.64 |
| Dec 2024 | $647 | $3.39 |
| Jan 2025 | $838 | $4.39 |
| Feb 2025 | $846 | $4.43 |
| Mar 2025 | $611 | $3.20 |
| Site | Cooling | Rate | Uptime | Cost per BTC | Profit per month | All-in per unit | Year 1 return |
|---|---|---|---|---|---|---|---|
| UAE | Hydro-cooled | 6.5¢ | 99.3% | $109,397 | -$78 | $3,250 | -29% |
| Nigeria | Hydro-cooled | 4.5¢ | 73.6% | $75,737 | $4 | $3,514 | 1% |
| Argentina | Hydro-cooled | 6.5¢ | 98.7% | $109,397 | -$77 | $3,556 | -26% |
| Specification | Value |
|---|---|
| Manufacturer | Bitmain |
| Model | Bitmain Antminer S19 Pro+ Hyd |
| Release date | Mar 2022 |
| Algorithm | SHA-256 |
| Hashrate | 191 TH/s |
| Power consumption | 5252 W |
| Efficiency | 27.5 J/TH |
| Cooling | Hydro-cooled |
| Dimensions | 410 x 170 x 209 mm (approx.) |
| Weight | 15.2 kg (approx.) |
The all-in price of the Bitmain Antminer S19 Pro+ Hyd (191 TH/s) is about $3,514 per machine, delivered, imported, installed and hosted in Nigeria with a two-month hosting deposit. That is the machine itself at $1,530 ($8.01 per TH/s, the Hong Kong price) plus shipping, infrastructure, import duty, customs, setup and the deposit. It is sold out with us; these figures use its market price.
As of Nov 1, 2026, hosted in Nigeria at 4.5¢/kWh, the Bitmain Antminer S19 Pro+ Hyd (191 TH/s) is calculated to generate $0.13 daily, $4.05 monthly and $48.56 yearly after electricity, at a bitcoin price of $77,951. It always changes with bitcoin's price and network difficulty.
Electricity to mine one bitcoin with the Bitmain Antminer S19 Pro+ Hyd costs about $75,737 in Nigeria, and $109,397 in UAE and $109,397 in Argentina. Bitcoin trades at $77,951, so every coin it mines is made 3% below the price of buying one.
At current bitcoin price and difficulty, the Bitmain Antminer S19 Pro+ Hyd returns -29–1% in its first year at our sites, after electricity, against everything paid up front: the machine, shipping, import, infrastructure, setup and hosting deposit. You keep the machine and every bitcoin it mines. It always changes.
The Bitmain Antminer S19 Pro+ Hyd produces 191 TH/s of SHA-256 hashrate and consumes 5,252 W, giving an efficiency of 27.5 J/TH. Its hydro cooling loop adds about 200 W for water pumps.
The Bitmain Antminer S19 Pro+ Hyd measures about 410 x 170 x 209 mm and weighs around 15.2 kg.
The Bitmain Antminer S19 Pro+ Hyd is hydro-cooled: water carries heat away from the hashboards, so it runs quietly with no fans and needs a cooling loop with a dry cooler.
We can host the Bitmain Antminer S19 Pro+ Hyd in UAE (6.5¢/kWh, 99.3% uptime), Nigeria (4.5¢/kWh, 73.6% uptime) and Argentina (6.5¢/kWh, 98.7% uptime). The bitcoin it mines goes straight to your own wallet.
The Bitmain Antminer S19 Pro+ Hyd sold for $14,413 in Mar 2022 and $611 as of Mar 2025, down 96%. Over that time it ranged from $525 to $14,413.
Bitmain announced the Bitmain Antminer S19 Pro+ Hyd in Mar 2022.