Home / Bitcoin miners / DG Hydro 1

DG Hydro 1 (20 GH/s)

To be released · last price $5,975 per unit · ElphaPex · Hydro-cooled · SHA-256

DG Hydro 1 bitcoin miner

The DG Hydro 1 (20 GH/s) is a hydro-cooled Scrypt Dogecoin ASIC miner from ElphaPex released in Nov 2024. It runs at 20 GH/s while drawing 6,200 W. It is not shipping yet — create an account to be told when units are available.

DG Hydro 1 profitability

As of Sep 19, 2026, hosted in Argentina at 6.0¢/kWh with 98.7% uptime. Bitcoin $80,934.

PeriodBitcoin minedRevenueElectricityProfit
Daily0.000000 BTC$0.00$9.55-$9.55
Weekly0.000000 BTC$0.00$66.86-$66.86
Monthly0.000000 BTC$0.00$290.54-$290.54
Yearly0.000000 BTC$0.00$3,486.12-$3,486.12

Electricity per bitcoin mined: —. Year 1 return: -35%.

Where to host the DG Hydro 1

SiteCoolingRateUptimeCost per BTCProfit per monthAll-in per unitYear 1 return
UAEHydro-cooled6.0¢99.3%-$292$8,461-41%
NigeriaHydro-cooled3.9¢73.6%-$141$9,874-17%
ArgentinaHydro-cooled6.0¢98.7%-$291$9,955-35%

DG Hydro 1 specifications

SpecificationValue
ManufacturerElphaPex
ModelDG Hydro 1
Release dateNov 2024
AlgorithmSHA-256
Hashrate
Power consumption6200 W
Efficiencynull J/TH
CoolingHydro-cooled
Weight25 kg (approx.)

DG Hydro 1 FAQ

How much does the DG Hydro 1 cost?

The DG Hydro 1 (20 GH/s) is to be released with us; its market price is about $5,975 per unit (— per TH/s). Delivered, imported, installed and hosted in Argentina with a two-month hosting deposit, the all-in cost is about $9,955 per machine.

What is the hashrate and power consumption of the DG Hydro 1?

The DG Hydro 1 produces 20 GH/s of Scrypt hashrate and consumes 6,200 W. Its hydro cooling loop adds about 200 W for water pumps.

What are the dimensions and weight of the DG Hydro 1?

The DG Hydro 1 measures about n/a and weighs around 25 kg.

Is the DG Hydro 1 air-cooled or hydro-cooled?

The DG Hydro 1 is hydro-cooled: water carries heat away from the hashboards, so it runs quietly with no fans and needs a cooling loop with a dry cooler.

Where can the DG Hydro 1 be hosted?

We can host the DG Hydro 1 in UAE (6.0¢/kWh, 99.3% uptime), Nigeria (3.9¢/kWh, 73.6% uptime) and Argentina (6.0¢/kWh, 98.7% uptime). The Dogecoin it mines goes straight to your own wallet.

When was the DG Hydro 1 released?

ElphaPex announced the DG Hydro 1 in Nov 2024.

Alternatives to the DG Hydro 1