Home / Bitcoin miners / D1 Hydro
Sold out · VolcMiner · Hydro-cooled · Scrypt
The VolcMiner D1 Hydro (33 GH/s) is a hydro-cooled Scrypt Dogecoin ASIC miner from VolcMiner released in Jan 2025. It runs at 33 GH/s while drawing 9,300 W, an efficiency of 282 J/GH. It is currently sold out; the figures below show what it would earn if hosted with us today.
As of Nov 4, 2026, hosted in Nigeria at 4.5¢/kWh with 73.6% uptime. Dogecoin $0.0773.
| Period | Dogecoin and Litecoin mined | Revenue | Electricity | Profit |
|---|---|---|---|---|
| Daily | 133 DOGE + 0.030866 LTC | $12.02 | $7.93 | $4.09 |
| Weekly | 930 DOGE + 0.216061 LTC | $84.11 | $55.50 | $28.60 |
| Monthly | 4,042 DOGE + 0.938941 LTC | $365.50 | $241.20 | $124.30 |
| Yearly | 48,499 DOGE + 11.27 LTC | $4,385.48 | $2,894.06 | $1,491.42 |
The same work earns Litecoin and Dogecoin at once (merge mining); revenue and profit count both coins. Electricity per Dogecoin mined: $0.0597. Mining output depends on the price of Dogecoin and Litecoin, network difficulty and uptime, and is not guaranteed. Nothing here is investment advice.
| Site | Cooling | Rate | Uptime | Cost / DOGE | Profit per month | All-in per unit | Year 1 return |
|---|---|---|---|---|---|---|---|
| UAE | Hydro-cooled | 6.5¢ | 99.3% | $0.0862 | $23 | — | — |
| Nigeria | Hydro-cooled | 4.5¢ | 73.6% | $0.0597 | $124 | — | — |
| Argentina | Hydro-cooled | 6.5¢ | 98.7% | $0.0862 | $23 | — | — |
| Specification | Value |
|---|---|
| Manufacturer | VolcMiner |
| Model | D1 Hydro |
| Release date | Apr 2025 |
| Algorithm | Scrypt |
| Hashrate | 33 GH/s |
| Power consumption | 9300 W |
| Efficiency | 282 J/GH |
| Cooling | Hydro-cooled |
| Weight | 28.6 kg (approx.) |
The D1 Hydro is sold out. Create an account and we will tell you when units are available.
The D1 Hydro produces 33 GH/s of Scrypt hashrate and consumes 9,300 W, giving an efficiency of 282 J/GH. Its hydro cooling loop adds about 200 W for water pumps.
The D1 Hydro measures about n/a and weighs around 28.6 kg.
The D1 Hydro is hydro-cooled: water carries heat away from the hashboards, so it runs quietly with no fans and needs a cooling loop with a dry cooler.
We can host the D1 Hydro in UAE (6.5¢/kWh, 99.3% uptime), Nigeria (4.5¢/kWh, 73.6% uptime) and Argentina (6.5¢/kWh, 98.7% uptime). The Dogecoin it mines goes straight to your own wallet.
VolcMiner announced the D1 Hydro in Jan 2025.