Cool, steady and predictable. Pilar, on the Paraná north of Buenos Aires. Industrial power at a rate the grid is glad to contract, and the coolest climate of any site we run.
Per kWh: 5.8¢ (from 6.5¢)
Uptime: 98.7% (last 30 days)
Cooling: Air, Hydro
Import duty: Yes
What is good
The mildest climate we have — 30 °C at the top end, so cooling overhead stays low
98.7% uptime on a stable industrial connection
Air and hydro cooling both available
What is not
6.0–6.5¢ per kWh, the same as the UAE and well above Nigeria
Import duty applies
No immersion cooling
Best for: Anyone who wants a bill they can predict a year out, and older air-cooled hardware.