Home / Bitcoin miners / Bitmain Antminer T19
Outdated · Last price $1,460 all-in, delivered, installed and hosted in Nigeria · Bitmain · Air-cooled · SHA-256
The Bitmain Antminer T19 (88 TH/s) is a air-cooled SHA-256 bitcoin ASIC miner from Bitmain released in Aug 2020. It runs at 88 TH/s while drawing 3,150 W, an efficiency of 35.8 J/TH. It is more than five years old and no longer competitive; the figures below are kept for reference.
More on this machine: Bitmain Antminer T19 price history · Bitmain Antminer T19 profitability history
As of Nov 2, 2026, hosted in Nigeria at 4.5¢/kWh with 73.6% uptime. Bitcoin $77,903.
| Period | Bitcoin mined | Revenue | Electricity | Profit |
|---|---|---|---|---|
| Daily | 0.000028 BTC | $2.15 | $2.63 | -$0.48 |
| Weekly | 0.000193 BTC | $15.05 | $18.40 | -$3.35 |
| Monthly | 0.000840 BTC | $65.42 | $79.98 | -$14.55 |
| Yearly | 0.010076 BTC | $784.99 | $959.61 | -$174.62 |
Electricity per bitcoin mined: $95,233. Year 1 return: -12%.
From $2,320 in Aug 2020 to $282 in Mar 2025 (-88%).
| Month | Price per unit | Price per TH |
|---|---|---|
| Aug 2020 | $2,262 | $25.70 |
| Sep 2020 | $2,713 | $30.83 |
| Oct 2020 | $3,247 | $36.90 |
| Nov 2020 | $5,886 | $66.89 |
| Dec 2020 | $7,325 | $83.24 |
| Jan 2021 | $9,289 | $105.56 |
| Feb 2021 | $10,399 | $118.17 |
| Mar 2021 | $10,417 | $118.37 |
| Apr 2021 | $8,146 | $92.57 |
| May 2021 | $5,511 | $62.62 |
| Jun 2021 | $6,721 | $76.37 |
| Jul 2021 | $8,650 | $98.30 |
| Aug 2021 | $8,759 | $99.53 |
| Sep 2021 | $9,176 | $104.27 |
| Oct 2021 | $9,335 | $106.08 |
| Nov 2021 | $8,892 | $101.04 |
| Dec 2021 | $8,200 | $93.18 |
| Jan 2022 | $7,746 | $88.02 |
| Feb 2022 | $7,007 | $79.63 |
| Mar 2022 | $6,584 | $74.82 |
| Apr 2022 | $5,725 | $65.06 |
| May 2022 | $3,900 | $44.32 |
| Jun 2022 | $3,102 | $35.25 |
| Jul 2022 | $3,006 | $34.16 |
| Aug 2022 | $2,682 | $30.48 |
| Sep 2022 | $2,083 | $23.67 |
| Oct 2022 | $1,643 | $18.67 |
| Nov 2022 | $1,309 | $14.87 |
| Dec 2022 | $1,241 | $14.10 |
| Jan 2023 | $1,333 | $15.15 |
| Feb 2023 | $1,353 | $15.37 |
| Mar 2023 | $1,445 | $16.42 |
| Apr 2023 | $1,405 | $15.97 |
| May 2023 | $1,313 | $14.92 |
| Jun 2023 | $1,259 | $14.31 |
| Jul 2023 | $1,228 | $13.95 |
| Aug 2023 | $1,147 | $13.03 |
| Sep 2023 | $988 | $11.23 |
| Oct 2023 | $946 | $10.75 |
| Nov 2023 | $876 | $9.95 |
| Dec 2023 | $971 | $11.03 |
| Jan 2024 | $1,060 | $12.05 |
| Feb 2024 | $986 | $11.20 |
| Mar 2024 | $952 | $10.82 |
| Apr 2024 | $797 | $9.06 |
| May 2024 | $591 | $6.72 |
| Jun 2024 | $591 | $6.72 |
| Jul 2024 | $590 | $6.71 |
| Aug 2024 | $459 | $5.22 |
| Sep 2024 | $260 | $2.95 |
| Oct 2024 | $280 | $3.18 |
| Nov 2024 | $320 | $3.64 |
| Dec 2024 | $298 | $3.39 |
| Jan 2025 | $386 | $4.39 |
| Feb 2025 | $390 | $4.43 |
| Mar 2025 | $282 | $3.20 |
| Site | Cooling | Rate | Uptime | Cost per BTC | Profit per month | All-in per unit | Year 1 return |
|---|---|---|---|---|---|---|---|
| UAE | Immersion | 6.5¢ | 99.3% | $137,558 | -$68 | $2,041 | -40% |
| Nigeria | Air-cooled | 4.5¢ | 73.6% | $95,233 | -$15 | $1,460 | -12% |
| Argentina | Air-cooled | 6.5¢ | 98.7% | $137,558 | -$67 | $1,431 | -56% |
| Specification | Value |
|---|---|
| Manufacturer | Bitmain |
| Model | Bitmain Antminer T19 |
| Release date | Aug 2020 |
| Algorithm | SHA-256 |
| Hashrate | 88 TH/s |
| Power consumption | 3150 W |
| Efficiency | 35.8 J/TH |
| Cooling | Air-cooled |
| Dimensions | 400 x 195 x 290 mm (approx.) |
| Weight | 14.2 kg (approx.) |
The all-in price of the Bitmain Antminer T19 (88 TH/s) is about $1,460 per machine, delivered, imported, installed and hosted in Nigeria with a two-month hosting deposit. That is the machine itself at $454 ($5.16 per TH/s, the Hong Kong price) plus shipping, infrastructure, import duty, customs, setup and the deposit. It is outdated with us; these figures use its market price.
As of Nov 2, 2026, hosted in Nigeria at 4.5¢/kWh, the Bitmain Antminer T19 (88 TH/s) is calculated to lose $0.48 daily, $14.55 monthly and $174.62 yearly after electricity, at a bitcoin price of $77,903. It always changes with bitcoin's price and network difficulty.
Electricity to mine one bitcoin with the Bitmain Antminer T19 costs about $95,233 in Nigeria, and $137,558 in UAE and $137,558 in Argentina. Bitcoin trades at $77,903, so every coin it mines is made above the price of buying one.
At current bitcoin price and difficulty, the Bitmain Antminer T19 returns -56–-12% in its first year at our sites, after electricity, against everything paid up front: the machine, shipping, import, infrastructure, setup and hosting deposit. You keep the machine and every bitcoin it mines. It always changes.
The Bitmain Antminer T19 produces 88 TH/s of SHA-256 hashrate and consumes 3,150 W, giving an efficiency of 35.8 J/TH.
The Bitmain Antminer T19 measures about 400 x 195 x 290 mm and weighs around 14.2 kg.
The Bitmain Antminer T19 is air-cooled with fans. In the UAE we run air-cooled machines in immersion tanks instead, which keeps them cool in desert heat.
We can host the Bitmain Antminer T19 in UAE (6.5¢/kWh, 99.3% uptime, immersion), Nigeria (4.5¢/kWh, 73.6% uptime) and Argentina (6.5¢/kWh, 98.7% uptime). The bitcoin it mines goes straight to your own wallet.
The Bitmain Antminer T19 sold for $2,320 in Aug 2020 and $282 as of Mar 2025, down 88%. Over that time it ranged from $242 to $10,494.
Bitmain announced the Bitmain Antminer T19 in Aug 2020.