Home / Bitcoin miners / Bitmain Antminer S19
Outdated · last price $309 per unit · Bitmain · Air-cooled · SHA-256
The Bitmain Antminer S19 (95 TH/s) is a air-cooled SHA-256 bitcoin ASIC miner from Bitmain released in May 2020. It hashes at 95 TH/s while drawing 3,250 W, an efficiency of 34.21 J/TH. It is more than five years old and no longer competitive; the figures below are kept for reference.
As of Sep 17, 2026, hosted in Argentina at 6.0¢/kWh with 98.7% uptime. Bitcoin $77,356.
| Period | Bitcoin mined | Revenue | Electricity | Profit |
|---|---|---|---|---|
| Daily | 0.000047 BTC | $3.60 | $4.85 | -$1.25 |
| Weekly | 0.000326 BTC | $25.19 | $33.95 | -$8.76 |
| Monthly | 0.001415 BTC | $109.48 | $147.54 | -$38.06 |
| Yearly | 0.016982 BTC | $1,313.67 | $1,770.29 | -$456.62 |
Electricity per bitcoin mined: $104,244. Year 1 return: -27%.
| Site | Cooling | Rate | Uptime | Cost per BTC | Profit per month | All-in per unit | Year 1 return |
|---|---|---|---|---|---|---|---|
| UAE | Immersion | 6.0¢ | 99.3% | $104,244 | -$38 | $2,338 | -20% |
| Nigeria | Air-cooled | 4.0¢ | 74.7% | $69,496 | $8 | $1,815 | 6% |
| Argentina | Air-cooled | 6.0¢ | 98.7% | $104,244 | -$38 | $1,665 | -27% |
| Specification | Value |
|---|---|
| Manufacturer | Bitmain |
| Model | Bitmain Antminer S19 |
| Release date | May 2020 |
| Algorithm | SHA-256 |
| Hashrate | 95 TH/s |
| Power consumption | 3250 W |
| Efficiency | 34.21 J/TH |
| Cooling | Air-cooled |
| Dimensions | 400 x 195 x 290 mm (approx.) |
| Weight | 16 kg (approx.) |
The Bitmain Antminer S19 (95 TH/s) is outdated with us; its market price is about $309 per unit ($3.25 per TH/s). Delivered, imported, installed and hosted in Argentina with a two-month hosting deposit, the all-in cost is about $1,665 per machine.
As of Sep 17, 2026, hosted in Argentina at 6.0¢/kWh, the Bitmain Antminer S19 (95 TH/s) is calculated to lose $1.25 daily, $38.06 monthly and $456.62 yearly after electricity, at a bitcoin price of $77,356. It always changes with bitcoin's price and network difficulty.
Electricity to mine one bitcoin with the Bitmain Antminer S19 costs about $104,244 in Argentina, and $104,244 in UAE and $69,496 in Nigeria. Bitcoin trades at $77,356, so every coin it mines is made above the price of buying one.
At current bitcoin price and difficulty, the Bitmain Antminer S19 returns -27–6% in its first year at our sites, after electricity, against everything paid up front: the machine, shipping, import, infrastructure, setup and hosting deposit. You keep the machine and every bitcoin it mines. It always changes.
The Bitmain Antminer S19 produces 95 TH/s of SHA-256 hashrate and consumes 3,250 W, giving an efficiency of 34.21 J/TH.
The Bitmain Antminer S19 measures about 400 x 195 x 290 mm and weighs around 16 kg.
The Bitmain Antminer S19 is air-cooled with fans. In the UAE we run air-cooled machines in immersion tanks instead, which keeps them cool in desert heat.
We can host the Bitmain Antminer S19 in UAE (6.0¢/kWh, 99.3% uptime, immersion), Nigeria (4.0¢/kWh, 74.7% uptime) and Argentina (6.0¢/kWh, 98.7% uptime). The bitcoin it mines goes straight to your own wallet.
Bitmain announced the Bitmain Antminer S19 in May 2020.